girlworld_club
Member
I am a prelim student, trying to do some hsc work so excuse the unfamiliarity.
A skyscraper of 110 floors is to be built. The first floor to be built will cost $3 million. The cost of building each subsequent floor will be $0.5 million more than the floor immediately below.
(i)
What will be the cost of building the 25th floor?
2
(ii)
What will be the cost of building all 110 floors of the skyscraper?
To find out my answer i re-arranged to make this formula:
3,000,000 + (f x 500000) - 500000
where f = the number of floors
is this the right approach to answering the question, or does it produce the wrong answer? any other ways of doing it?
A skyscraper of 110 floors is to be built. The first floor to be built will cost $3 million. The cost of building each subsequent floor will be $0.5 million more than the floor immediately below.
(i)
What will be the cost of building the 25th floor?
2
(ii)
What will be the cost of building all 110 floors of the skyscraper?
To find out my answer i re-arranged to make this formula:
3,000,000 + (f x 500000) - 500000
where f = the number of floors
is this the right approach to answering the question, or does it produce the wrong answer? any other ways of doing it?